plan-work
story: e45s29
Section titled “story: e45s29”Plan Work
Section titled “Plan Work”Spine position: Step 3 — scope-work → slice-tasks → plan-work.
Produce a detailed, verifiable implementation plan in the active epic capsule directory (specs/epics/eNN-slug/). Output: a story spec .md file (countable-story-format) and a decoupled eNNsYY-tasks.yaml with runnable verify commands. “I think it works” is not a step.
HARD GATE — Do NOT proceed with a plan until the task’s success criteria are clear. If success is ambiguous, run
define-successfirst to convert the task into “step → verify: <cmd>” pairs.RECURSIVE DISCIPLINE — This lifecycle applies to EVERY task, including updating these skills. Never skip planning because a task is “meta” or “just documentation.”
Pre-flight
Section titled “Pre-flight”Read: release-plan.yaml, product/SCOPE_LATEST.yaml, active epics/<capsule>/epic.yaml, tech-architecture/tech-stack.md, product/GLOSSARY_LATEST.yaml.
ZOOM-OUT MANDATE (v1.17.0) — If modifying an existing module: (1) State the module’s purpose. (2) Name its callers. (3) List its contracts. Cannot answer all three? Stop — scope is misunderstood.
If this plan touches an existing module, run assess-impact first to understand blast radius.
DISCOVERY MANDATE (v1.18.0) — For external API integration, verify the API signature via local docs or search and quote at least one technical detail in the step’s context.
MULTIPLE INTERPRETATIONS (HARD GATE) — If the task admits ≥2 valid interpretations, list them and get a user decision before drafting any steps.
COMPLEXITY PUSHBACK (HARD GATE) — Every new abstraction MUST include a one-sentence “Reason for Depth.” If it can’t be filled non-trivially, the abstraction is premature — use inline code instead.
SLOPCHECK (HARD GATE) — For every external package, tag it
[OK],[SUS], or[SLOP].[SUS]/[SLOP]require human approval before execution.
Invocation modes
Section titled “Invocation modes”- Default: full plan with zoom-out mandate, impact assessment, slopcheck
--fast: Skip zoom-out and impact assessment. Use for tasks under 3 BCPs with no module interface changes.
Process
Section titled “Process”Timing:
bash scripts/bp-timing.sh start plan-workat invocation;bash scripts/bp-timing.sh end plan-workbefore handoff.
-
Explore — Use
Exploresubagent to understand affected modules, existing test patterns, similar prior art, and dependencies. -
Draft steps — Break implementation into the smallest possible steps where each step leaves the codebase working, has one observable outcome, and can be verified with a single command. Red-flag check: name any rationalization you caught before moving to step 3.
-
Write capsule story spec + tasks — Output two files inside the active epic capsule. See REFERENCE.md for file formats and the plan-template. Each task MUST include a
risk:field (P0|P1|P2|P3) based on BCP + story type heuristics (see REFERENCE.md). If a test plan artifact (specs/tech-architecture/eNN-TEST_PLAN_LATEST.md) exists, read it and inherit its P0/P1 risk classifications and scenario IDs (SC-eNNsYY-P0-NN). Each task optionally includes asecurity:field (none/low/medium/high) sourced from the epic’sspecs/security/epics/<id>/THREAT_MODEL.md. Tasks withsecurity: mediumorsecurity: highMUST include “no new security findings in affected paths” in their verify steps.Requirement delta tags (e45s29): When a story modifies existing behavior, the story spec § Requirements MUST use OpenSpec-style delta tags with mandatory before/after content:
Tag When Required content ADDEDNew requirement Full requirement text MODIFIEDChanged behavior Before: prior behavior · After: new behavior REMOVEDRetired requirement Before: what existed · After: (removed) + rationale RENAMEDID or title change only Before: old ID/title · After: new ID/title Net-new stories (greenfield) use
ADDEDonly.MODIFIED/REMOVED/RENAMEDwithout before/after blocks fail the plan-work gate. -
Verify step format — Every step MUST follow:
N. <What to do> → verify: <runnable command>. See REFERENCE.md for good/bad examples.
4a. Cross-artifact consistency pass (HARD GATE — e45s04) — Before handoff, run:
bash scripts/lib/plan-consistency-check.sh specs/epics/<capsule>/Print CRITICAL / HIGH / MED findings. CRITICAL or HIGH blocks code generation — fix capsule artifacts first. MED requires explicit user acknowledgment.
4b. tasks.yaml failing ledger (e45s06) — Every new task entry starts with status: failing. Only flip to status: passing after its verify: command exits 0 during develop-tdd or verify-work. Never pre-mark passing at plan time.
- Review with user — Confirm step order, granularity, and that verify commands are runnable in this project.
Lifecycle Gates (e45s09)
Section titled “Lifecycle Gates (e45s09)”| Gate | When | Pass condition |
|---|---|---|
| Pre-Implementation | Before kickoff-branch / first RED commit |
Root-cause stated for bugs; assess-impact done for module changes; plan-consistency-check PASS |
| Validation | Story marked done | All tasks status: passing; verify evidence in specs/verifications/ |
| Reopen-don’t-refile | Regression on shipped story | Reopen existing story/bug — do not create duplicate capsule entries |
After writing capsule tasks, suggest kickoff-branch (if not already on a feature branch) then build-epic, execute-plan, or develop-tdd.
Verify
Section titled “Verify”→ verify: test -f scripts/lib/plan-consistency-check.sh && bash scripts/lib/plan-consistency-check.sh specs/epics/e45-quality-core/ 2>&1 | head -5
Handoff
Section titled “Handoff”Gate: READY -> next: kickoff-branch Writes: state.yaml handoff.next_skill = kickoff-branch